Construction QA/QC guides
Plain-English guides for QA/QC engineers, document controllers and site teams: what each document is, how to prepare it, and how to get it approved first time.
What is a WIR in construction?
WIR meaning, what the format contains, how to prepare one step by step, status codes, and WIR vs MIR.
Read the guide →WIR vs RFI vs MIR vs NCR
The everyday QA/QC documents side by side: what each one is for and when to use it.
Why WIRs get rejected
The most common reasons consultants reject inspection requests, and how to avoid every one.
Material approval process (MAR)
How to prepare a material approval request that gets approved without resubmission.
What is an ITP in construction?
Inspection and Test Plans explained, including hold and witness points and how to prepare one.
What is an NCR and how to close it
Raising, answering and closing non-conformance reports with proper corrective action.
Need the forms too?
Ready-to-use WIR, MAR, MIR, NCR and RFI formats, registers and site reports. Free to download, no sign-up.
